Handsome Savings - Limited Time Offer 30% OFF - Ends In 0d 0h 0m 0s Coupon code: 50OFF
Welcome to QA4Exam
Logo

- Trusted Worldwide Questions & Answers

BCS TAE Exam Actual Questions

The questions for TAE were last updated on Oct 4, 2024.
  • Viewing page 1 out of 8 pages.
  • Viewing questions 1-5 out of 40 questions
Unlock Access to All 40 Questions & Answers
Question No. 1

Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.

Which of the following would you expect to be the MOST specific risk associated with this scenario?

Show Answer Hide Answer
Correct Answer: D

Question No. 2

Your goal is to verify completeness, consistency and correct behavior of an automated test suite. The TAS has been proven to successfully install in the SUT environment. All the preliminary checks to verify the correct functioning of the automated test environment and test tool configuration, installation and setup have successfully completed.

Which of the following is NOT a relevant check for achieving your goal in this scenario?

Show Answer Hide Answer
Correct Answer: D

Question No. 3

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?

Show Answer Hide Answer
Correct Answer: C

Question No. 4

Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writing the automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight's repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value

Show Answer Hide Answer
Correct Answer: C

Question No. 5

Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created --specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields ( e.g text boxes).

What is the BEST recommendation for improving the TAS?

Show Answer Hide Answer
Correct Answer: A

Product Image

Unlock All Questions for BCS TAE Exam

Full Exam Access, Actual Exam Questions, Validated Answers, Anytime Anywhere, No Download Limits, No Practice Limits

Get All 40 Questions & Answers