Prepare for the CIPS Scope and Influence of Procurement and Supply exam with our extensive collection of questions and answers. These practice Q&A are updated according to the latest syllabus, providing you with the tools needed to review and test your knowledge.

QA4Exam focus on the latest syllabus and exam objectives, our practice Q&A are designed to help you identify key topics and solidify your understanding. By focusing on the core curriculum, These Questions & Answers helps you cover all the essential topics, ensuring you're well-prepared for every section of the exam. Each question comes with a detailed explanation, offering valuable insights and helping you to learn from your mistakes. Whether you're looking to assess your progress or dive deeper into complex topics, our updated Q&A will provide the support you need to confidently approach the CIPS L4M1 exam and achieve success.

The questions for L4M1 were last updated on Feb 21, 2025.
  • Viewing page 1 out of 8 pages.
  • Viewing questions 1-5 out of 40 questions
Get All 40 Questions & Answers
Question No. 1

What is an electronic system? Describe the following: e-requisitioning, e-catalogues, e-sourcing, e-payment technologies (25 marks)

Show Answer Hide Answer
Correct Answer: A

How to approach this question:

- Your response will need 5 definitions. For 25 points that means 5 points per section so think about the level of detail you'll need to include. It would be 5 points for electronic system (i.e. your introduction and conclusion), and then do a paragraph on each of the technologies. In the description you could talk about why it's used and the advantages, and give some examples if you know any.

- Definition of electronic system -- a system which uses some form of technology and automates a procurement process than would otherwise have been completed manually.

- E-Requisitioning -- a way of ordering goods or services. Includes the use of integrated ordering systems such as: ERP/ ERP II / MRP / MRP II

- E-Catalogue- an electronic display of what goods can be ordered. A simple example of this may be a supplier displaying the goods they offer on their website and the prices to purchase the goods.

- E-Sourcing -- this involves the early stages of the tender process- using an electronic portal to find a supplier and / or conduct a tender exercise.

- E-Payment -- the P2P part of the cycle (procure to pay) -- may involve electronic POs and Invoices, BACS, CHAPS and SWIFT payment systems, and the use of Purchasing Cards

Example essay:

Electronic systems, commonly refered to as E-procurement, is the business-to-business or business-to-consumer purchase of goods or services, typically using the Internet or other information/ networking systems such as ERP systems. It has developed in the past 20 years as technology has improved and replaces time-consuming manual processes and is now considered the 'norm'. Electronic systems and e-procurement can be used throughout the entire supply chain- not just between a single buyer and supplier. Examples of electronic systems including the following:

E-requisitioning

This is often used in manufacturing organisations to order raw materials. An electronic 'bill of materials' is created and stock levels are automatically updated. As materials get used and a pre-determined level is reached, this triggers a new order which is placed via an e-requisitioning system such as MRP. It is a technological version of the traditional kan-ban (2 bin) system. E-requisition tools are often cloud-based. It helps buyers simplify the buying process, track orders and provides higher levels of visibility on spend. The main disadvantage to this technology is that it requires technology interfacing between the buyer and suppler, which may be expensive.

E-catalogues

This is a digital or online version of a catalogue- a document that details what you can buy and at what price. There are two main types -- buy side catalogues and sell side catalogues. A buy-side catalogue is an internal system used by a buyer which hosts a list of pre-approved suppliers from whom purchases can be made. It may include details of commonly bought items and the prices. The use of this reduces maverick spending and ensures consistency in purchases (e.g. whenever lightbulbs need to be ordered, the same lightbulbs are ordered so the office lighting is consistent). A sell-side catalogue is provided by a supplier and details what they offer- it often includes prices, any discounts for bulk buying and may also let buyers know of availability (e.g. the website may say only two items remaining). This may be as simple as a price list on their website, available for anyone to view.

E-sourcing

This is a tool that helps a buyer find the most suitable supplier. Examples include e-tendering websites where a buyer can host a competition to find a supplier. E-auctions are also a type of e-sourcing tool. The tool (often a website) hosts all of the tendering documents and allows for buyers and suppliers to communicate during the tender process (for example if there are any clarifications needed on the specification). Using this tool allows for transparency and equal treatment, but also saves time in completing the tender exercise. PQQs can be automated and some e-sourcing tools include the use of Artificial Intelligence which can 'read' tender submissions and automatically exclude suppliers who do not fulfil the required criteria.

E-payment technologies

These are methods to pay for goods and services that replace the need for cash and cheques. Examples include online bank transfers, electronic Purchase Orders and Invoices and the use of Pre-Payment cards. These act like credit cards for employees to use when they need to buy supplies. For example, if you have a maintenance team that frequently need to purchase low-value items like screws and paint, you could issue the team with a Pre-Payment card with a certain limit (e.g. 500/ month) so they can buy what they need. The company will then automatically be sent a monthly invoice for all of the purchases. This saves time from having to issue the maintenance team with petty cash for the purchases and allows for greater visibility over spend (e.g. how many screws are typically bought per year?). Another typical use is for staff travel.

In conclusion, procurement teams benefit significantly from leveraging electronic tools, including e-requisitioning, e-catalogues, e-sourcing, and e-payment technologies. The adoption of these electronic tools brings about various advantages that enhance efficiency, transparency, cost-effectiveness, and overall effectiveness in the procurement process. Moreover E-procurement tools has helped develop the procurement function into a professional and respected function and allows for a more pro-active rather than reactive approach to purchasing.

Tutor Notes:

- Fun Fact! In the public sector, it is mandated that electronic systems are used in procurement (Public Contract Regulations 2015) as this helps to achieve the objectives of transparency and equal treatment. Where manual systems are used, it is easy to manipulate the tender process. For example, a buyer could read some tender submissions before the deadline for submission and no one would know, but with an electronic system this is impossible as it locks evaluators out until the deadline has passed and all bidders have submitted their responses. (note PCR 2015 is being replaced in 2024- details are still TBC but the above fun fact will still remain in the new legislation- they're definitely still going to make it compulsory).

- You could also mention the names of systems if you know any. For example, e-sourcing tools include MyTenders.com and Delta E-Sourcing. PO / Invoice systems include Sage, Xero and QuickBooks.

- The question doesn't ask for advantages of using these technologies but you could mention this in your answer. Just be sure that this isn't the focus of your response- the question asks specifically for you to DESCRIBE the systems so detailed s and examples are where you will secure the most points.

- p.108


Question No. 2

Industry Sectors can be classified as Primary, Secondary and Tertiary. What is meant by an 'industry sector'? Describe the main characteristics of and types of business you will find in these. (25 marks)

Show Answer Hide Answer
Correct Answer: A

How to approach this question

- The first question can be a simple introduction with a bit of extra detail. The main 'meat' to your essay is going to be explaining the three sectors, their characteristics and example businesses.

- Aim for three well explained characteristics as a minimum

Example essay

An industry sector refers to a broad category or grouping of businesses and economic activities that share similar characteristics and functions in the production and distribution of goods and services. These sectors are often classified into three main categories: Primary, Secondary, and Tertiary. Here are the main characteristics and types of businesses you will find in each of these industry sectors:

1. Primary Sector:

* Characteristics: The primary sector involves activities related to the extraction and production of raw materials and natural resources directly from the environment. This sector relies on nature and weather patterns: businesses in the primary sector are highly dependent on natural factors such as climate, weather, soil quality, and geographic location. These factors can significantly impact the productivity and profitability of primary sector activities. Extreme weather such as floods can severely impact this sector. Moreover there is a seasonality to this sector and many activities in the primary sector require a significant amount of manual labour, particularly in agriculture, fishing, and forestry. However, modern technology has also been integrated into some primary sector activities to increase efficiency.

* Types of Businesses: a. Agriculture: This includes farming, crop cultivation, livestock raising, and forestry. b. Mining and Extraction. c. Fishing and Aquaculture: Forestry and Logging: Includes the harvesting of timber and related activities.

2. Secondary Sector:

* Characteristic: The secondary sector focuses on the transformation of raw materials and intermediate goods into finished products. The main characteristic of the sector is that it requires high levels of machinery and industrial techniques. There is a reliance on technology. Secondly, the secondary sector adds significant value to the products compared to their raw material form. This value addition is achieved through processing, assembly, and quality control processes. The third main characteristic is standardisation: Manufacturing processes often involve standardization of components and processes to ensure consistency and quality in the final products. Standardization helps in economies of scale.

* Types of Businesses: a. Manufacturing: This sector includes factories and plants that produce tangible goods such as automobiles, electronics, textiles, and machinery. b. Construction: Involves the building and construction of structures like buildings, bridges, and infrastructure. c. Utilities: Companies providing essential services like electricity, gas, and water supply fall into this category.

3. Tertiary Sector:

* Characteristic: The tertiary sector is also known as the service sector and involves businesses that offer various services to consumers and other businesses. The main defining characteristic of this sector is Intangibility: Services are intangible and cannot be touched or held. They are often experienced directly by consumers through interactions with service providers or through the use of technology. Secondly, High Human Involvement: The tertiary sector relies heavily on a skilled and often highly educated workforce to deliver services effectively. This can include professionals such as doctors, lawyers, teachers, and customer service representatives. Lastly, Customization: Many services are customized to meet the specific needs and preferences of individual clients or customers. This personalization is a key characteristic of the tertiary sector. For example Legal Advice will always be different depending on the specific needs of the client.

* Types of Businesses: a. Retail and Wholesale: Businesses engaged in the sale of goods to consumers or to other businesses. b. Healthcare and Education: This includes hospitals, clinics, schools, colleges, and universities. c. Financial Services: Banks, insurance companies, and investment firms are part of this sector. d. Hospitality and Tourism: Hotels, restaurants, travel agencies, and entertainment venues fall into this category. e. Professional Services: Legal, accounting, consulting, and IT services are part of the tertiary sector.

These industry sectors represent the different stages of economic activity, with the primary sector providing raw materials, the secondary sector processing and manufacturing goods, and the tertiary sector offering services and distribution. Together, these sectors form the backbone of an economy, contributing to its growth and development

Tutor Notes

- I've gone overboard on naming the types of organisation in the different sectors. You don't have to remember all of these. 3 examples is sufficient to get good marks. I've just named them all so you can see what could be considered a right answer.

- Some people are talking about Quaternary and Quinary Sectors. CIPS is not one of those people, so don't worry if you come across those terms in any further reading. But FYI

1.

* Quaternary Sector: This sector involves knowledge-based activities, including research and development, information technology, and data analysis.

* Quinary Sector: The quinary sector comprises high-level decision-making and leadership roles in areas such as government, academia, healthcare, and top-level corporate management.

- LO 4.1 p.196


Question No. 3

What is meant by Stakeholder Mapping? Describe a tool that can be used by a Procurement Professional to map the stakeholders at their organisation (25 points)

Show Answer Hide Answer
Correct Answer: A

How to approach this question:

- Define stakeholder mapping -- completing an analysis of the stakeholders of an organisation and dividing them into categories depending on certain characteristics. This is often represented visually on a graph or matrix.

- Describe a Stakeholder mapping tool -- the most common tool is Mendelow's Stakeholder Matrix so I would recommend using this one. It is explained in detail in the study guide. However, the question is open so you could choose to describe another tool such as Edgar's Stakeholder Position Analysis if you so wished. You wouldn't be wrong choosing this, but honestly, I'd just go for Mendelow. You can't go wrong with Mendelow. Because the Matrix has 4 sections you can imagine you'd get 5 points for the definition of stakeholder mapping, and 5 points for each of the quadrants of the matrix.

Essay Plan:

Introduction - The reason why stakeholder mapping is important is because interests and expectations of stakeholder groups will be different and possibly conflicting. Mapping this allows an organisation to see the variety and decide on an appropriate management style for each stakeholder group.

Paragraph 1 - Mendelow's Power / Interest Matrix maps stakeholders based on their influencing power and the strength of their motivation to use that power. It uses a 2x2 grid and defines power as high or low and interest and high or low. It then provides four strategies for managing the stakeholders based on which quadrant of the grid the stakeholder falls into. These 4 categories are:

Paragraph 2 - Keep satisfied -- high power but low interest. If the stakeholder becomes dissatisfied or concerned their interest may peak. Examples include regulatory bodies, shareholders, senior management. The best approach is to keep them up to date so they are informed of what is going on, but do not burden them with information they do not need.

Paragraph 3 - Manage Closely -- AKA Key players -- includes major customers, key suppliers, partners, senior management. These stakeholders need to know everything that is going on and approve of what is going on. The recommended strategy is early involvement and participation, and integrating their goals with yours. This group requires regular communication and meetings. You should take their opinions on board.

Paragraph 4- Monitor -- minimum effort required -- this is the low priority group as they have low power and low interest. Includes small volume suppliers and other organisational functions with no direct interest in your activities. This group does not need to receive regular communication.

Paragraph 5 - Keep informed - high interest, but low power. If they're not kept in the loop and understand the need for decisions, they may lobby together to protect their interest if they feel threatened. Employee groups, suppliers and community groups may be in this category. This group should receive regular communication.

Conclusion - Mendelow created the matrix in 1991 and it is still used today. It is a popular management tool due to its simplicity. It's important to notes that stakeholders can move through the matrix- it isn't stagnant. For example, at the beginning of a project a manager in another department may be classed as 'low priority' because they are seen to have no interest and no power in the project. However, as the project progresses the manager may become interested. They will then transfer into the keep informed category. Therefore, the matrix should be redone regularly throughout the lifetime of a project to capture any movements. The matrix should also be redone for each individual project -- it cannot be assumed that a stakeholder who had interest in one project would be interested in another.

Tutor Notes

- The above essay plan is basically the entire essay, I got carried away. The only thing you'd need to add into that is an example of a stakeholder for each of the sections! (e.g. the CEO is high power, but low interest stakeholder for the procurement department. He/ She doesn't care about the day to day operations but should be kept informed of any big news). For your examples you could use your own place of work.

- At level 4 you don't have to analyse the model, you just have to be able to memorise it and repeat it. Mendelow comes up again at Level 5 and 6 in a bit more detail. If you want to score super bonus points you could mention in your conclusion that the main disadvantage of Mendelow's Matrix is that it doesn't take into consideration the stakeholder's position on the project -- whether they're for it or against it. Therefore, it doesn't provide the full picture or provide much help on how to manage stakeholders. E.g. two stakeholders might both be in 'manage closely' section, but one is for the project and the other against -- they'd need to be handled very differently!

- Study guide p. 65


Question No. 4

Describe regulation that govern the Public Sectors and explain how this may impact upon procurement activities (25 marks).

Show Answer Hide Answer
Correct Answer: A

How to approach this question

- You do need to know some legislation for public sector here. This may be difficult if you don't work in the Public Sector. If you're struggling with this, you could also talk about general legislation that governs all types of organisations such as the Equalities Act and Modern Slavery Act.

- This is also a tough question if you're not British. CIPS is a UK based organisation and the syllabus therefore only talks about British legislation. If you're in a different country you could talk about the legislation in your own country, providing the question doesn't specifically mention UK Law.

- Either way I would recommend knowing a couple of pieces of British Legislation. You don't need to be an expert but just state what they are and what the purpose is should be enough to get you a pass.

Example essay

The public sector, which encompasses various governmental and state-owned enterprises, plays a pivotal role in the governance and provision of essential services. This sector operates under a strict framework of regulations and policies, ensuring that its operations are fair, transparent, and accountable. Among the most critical aspects of these operations is procurement, the process through which the public sector acquires goods, services, and works. This essay will explain key regulations governing the public sector, focusing on the Public Contracts Regulations (PCR) 2015, Late Payment Regulations 2016, Equalities Act 2010, and Public Services (Social Value) Act 2012, and explores how these regulations impact procurement activities.

The Public Contracts Regulations (PCR) 2015

The PCR 2015 plays a foundational role in public sector procurement in the UK. It sets out the procedures for procuring contracts, aiming to ensure fairness and transparency in the process. The regulations mandate that all procurement processes must be conducted in a manner that prevents discrimination and allows equal access to potential contractors, regardless of their size or location. For example, the open tendering process under PCR 2015 has enabled a more diverse range of companies, including small and medium-sized enterprises, to participate in government contracts, enhancing competition and innovation. The four 'pillars' of the PCR are derived from EU Procurement Directives and are: non-discrimination, free movement of goods, equality of treatment and transparency.

Late Payment Regulations 2013

The Late Payment Regulations 2013 address a critical aspect of procurement: the timely payment for goods and services. This regulation ensures that public sector organizations pay their suppliers within a stipulated time frame, significantly impacting the financial stability of these suppliers. For instance, the regulation has been particularly beneficial for small businesses that rely on prompt payments to maintain cash flow. The introduction of these regulations has improved the trust between public sector entities and their suppliers, leading to more efficient procurement processes.

Equalities Act 2010

The Equalities Act 2010 is another crucial piece of legislation impacting public sector procurement. This Act prohibits discrimination in the workplace and in the provision of services, extending its influence to the procurement process. Public sector entities must ensure that their procurement decisions do not discriminate against any group and that they promote equality. For instance, when a public sector organization issues a tender, it must ensure that the selection criteria do not unfairly disadvantage any potential supplier based on irrelevant characteristics. This approach not only fosters a more inclusive procurement environment but also helps to tap into a wider talent and supplier pool, enhancing the quality and effectiveness of public services.

Public Services (Social Value) Act 2012

The Public Services (Social Value) Act 2012 marks a significant shift in how procurement is approached in the public sector. This Act requires public sector organizations to consider how the services they procure can improve the economic, social, and environmental well-being of their are

a. This means that when a public sector entity procures goods or services, it must consider factors beyond just the price and quality. For example, a local government might prioritize suppliers who can demonstrate a commitment to environmental sustainability or who offer employment opportunities to local residents. This approach to procurement encourages a more holistic view of value for money, factoring in the wider impact of procurement decisions on society.

Public Accountability and Freedom of Information Requests

In addition to these specific regulations, the concept of public accountability and the mechanism of Freedom of Information requests play a crucial role in the public sector, especially in procurement activities. Public accountability ensures that entities are answerable to the public and their actions are transparent. Freedom of Information requests enable individuals and organizations to access information held by public authorities, which includes details of procurement decisions and contracts. This transparency is critical in ensuring that procurement activities are conducted ethically and responsibly, deterring corruption and mismanagement.

In conclusion, the regulation of the public sector, particularly in the realm of procurement, are complex. Regulations such as the PCR 2015, Late Payment Regulations 2016, Equalities Act 2010, and the Public Services (Social Value) Act 2012, along with the principles of public accountability and transparency, ensure that procurement activities are conducted in a fair, transparent, and socially responsible manner. These regulations not only safeguard the interests of suppliers, especially smaller businesses, but also ensure that the public sector remains a model of integrity and efficiency and that taxpayers' money is well spent.

Tutor Notes

- Okay this is important: The PCR 2015 regulations are being rescinded in 2024. They're based on EU Law and the UK has left the EU. I know we left a while ago now but it's taken us a long time to address the issue and figure out what we want to do about it. There was also a pandemic that got in the way of people making any decisions in parliament that weren't to do with Covid. The PCR 2015 will be replaced in late 2024 with new 'British' rather than European rules.

- At the time of writing this (December 2023) we don't 100% know what the new rules are going to look like and if you're taking this exam from November 2024 onwards, I recommend doing a bit of research into the new regulations.

- Now the complicated bit- the CIPS syllabus is valid from 2024-2028 and doesn't address that legislation is changing. I therefore don't really know what they're going to expect when students are taking this exam and the study guide information is out of date. If you're not working in the Public Sector, how are you to know the legislation has changed?

- My advice is this- briefly learn PCR 2015- the four pillars in particular, and when the new legislation comes out, have a quick google and see if these pillars are still the same. The regs aren't going to change THAT much -- things like transparency and equal treatment are still going to be really important, but there may be some slight language changes. Plus, if you're able to mention in an essay that there's new legislation, it's going to make you sound super clever.

- LO 4.2 p.211


Question No. 5

Sarah has recently been hired as the new Head of Procurement at Alpha Ltd, a manufacturer of small electronics such as hairdryers and alarm clocks. Alpha Ltd has a large factory based in Birmingham where many of the products are manufactured. One of the large pieces of machinery in the factory has recently broken and Sarah has been charged with replacing it as quickly as possible. Sarah is considering using the Whole Life Costing approach to this procurement. What is meant by Whole Life Costing? (5 points). Discuss 5 factors that Sarah should consider when buying new machinery (20 points).

Show Answer Hide Answer
Correct Answer: A

How to approach this question

- I'd use clear headings with numbers for this one. It asks you for a definition and 5 factors. Number them. Makes it easy for you to write and easy for the examiner to mark.

- Don't go over 5 -- you won't get any extra points for this. So spend your time giving examples and explaining the 5 well, rather than naming more than 5.

Example Essay

As the new Head of Procurement at Alpha Ltd, Sarah faces the urgent task of replacing a critical piece of machinery in the company's Birmingham factory. Recognizing the complexity of the decision, Sarah contemplates utilizing the Whole Life Costing approach to ensure a comprehensive evaluation that goes beyond initial expenses. This essay explores the concept of Whole Life Costing and delves into five essential factors Sarah should consider when procuring new machinery.

Definition:

Whole Life Costing (WLC) is a procurement approach that considers the total cost associated with an asset throughout its entire lifecycle. Unlike traditional procurement methods that focus primarily on the initial purchase price, WLC evaluates all costs incurred from acquisition to disposal. This includes operational, maintenance, and disposal costs, providing a holistic perspective on the true financial impact of an asset over time.

Factors to Consider in Machinery Procurement

1) Initial Purchase Price:

While WLC looks beyond the initial cost, the purchase price remains a critical factor. Sarah should balance the upfront expense with the long-term costs to ensure the initial investment aligns with the overall financial strategy.

2) Operational Costs:

Sarah needs to analyze the ongoing operational costs associated with the new machinery. This includes energy consumption, routine maintenance, and potential repair expenses. Opting for energy-efficient and reliable equipment can contribute to substantial operational savings over the machine's lifespan, even though this may result in a higher up-front purchase price

3) Training and Integration:

The cost of training employees to operate and maintain the new machinery is a significant consideration. Sarah should assess how easily the equipment integrates into existing workflows and whether additional training programs are required, impacting both immediate and long-term costs.

4) Downtime and Productivity:

Evaluating the potential downtime and its impact on productivity is crucial. Sarah should assess the reliability and historical performance of the machinery to gauge its potential contribution to sustained production levels and minimized disruptions, impacting the overall operational efficiency.

5) Technology Upgrades and Adaptability:

Sarah should consider the machinery's adaptability to technological advancements and potential upgrades. Investing in equipment that allows for seamless integration with future technologies ensures that Alpha Ltd remains competitive and resilient in a rapidly evolving industry landscape.

In conclusion, adopting a Whole Life Costing approach empowers Sarah to make informed decisions that align with Alpha Ltd's strategic goals. By considering factors beyond the initial purchase price, such as operational costs, training, downtime, and technology adaptability, Sarah ensures that the replacement machinery not only meets immediate production needs but proves to be a cost-effective and efficient asset throughout its entire lifecycle. The WLC approach safeguards against unforeseen financial burdens, fostering sustainable and informed procurement practices in the dynamic manufacturing environment.

Tutor Notes

- Whole Life Costing is on p.28

- Total Life Cycle Costs, Total Cost of Ownership and Life Cycle Costs are all practically the same thing. The book says they're slightly different, but don't get yourself bogged down in trying to remember the differences. Honestly, in the real world, people use this language interchangeably.

- Other factors you could have chosen to talk about include commissioning costs and disposal costs

- Don't worry if you feel CIPS breezed through this as a topic, they did. It's explained much better in L4M7. You can read more about it here: Whole Life Costing - What is Whole Life Costing | CIPS and here Whole-Life Cost: What it Means, How it Works (investopedia.com)