Which two conditions will cause high Cache Write Pending on a VSP G8000? (Choose two.)
For a VSP G1000 system serving a mission critical interactive workload, which two statements are true about VSD failover? (Choose two.)
A VSP G1000 customer is concerned about high VSD utilization alerts during their nightly backup and application maintenance window. To address their concerns, you want to inform them about the maximum acceptable utilization level range. What would be the range in this scenario?
An experienced system administrator reports near maximum MPB utilization with VSP G400 arrays operating in a GAD pair. Each array is supporting 100K IOPS with a 50% read workload. The MPBs should be capable of supporting more than 200K IOPS with this profile according to the basic array sizing tools.
Which two statements are correct in this scenario? (Choose two.)
A customer is replicating VSP G1000 production data using HUR. The customer experiences a network outage. During the outage, the customer reported an increase in response times.
Which two actions would minimize this problem during future network outages? (Choose two.)
Full Exam Access, Actual Exam Questions, Validated Answers, Anytime Anywhere, No Download Limits, No Practice Limits
Get All 60 Questions & Answers