In the early phase of a project, after the project requirements are clarified, the project owner should Checklist to describe the customer's requirements. (Capitalize the first letter of each word.)
Customer Requirement Specification (CRS) is a document that needs to be output after the project requirements are clarified. The CRS describes the customer's requirements in detail and serves as the basis for subsequent project design and delivery.
Which of the following statements are true about the WLAN site survey In different typical scenarios? (Select All that Apply)
Only: All statements are true about the WLAN site survey in different typical scenarios.
When calculating the number of APs, you can divide the total required bandwidth by the maximum bandwidth of a single AP.
When calculating the number of APs, you cannot simply divide the total required bandwidth by the maximum bandwidth of a single AP. You also need to consider other factors such as signal coverage area, user density, interference level, and application type.
Which of the following statements about WLAN roaming and signal strength Is false?
B is false because generally, a STA roams when it detects that the signal strength is less than -70 dBm or -65 dBm, not -75 dBm.
After the HTTP domain name is entered in a browser, the user Is not redirected to the Portal URL. Which of the followings is the possible cause for this failure? (Select All that Apply)
C is false because HTTPS redirection is not required for Portal authentication to work properly.
Full Exam Access, Actual Exam Questions, Validated Answers, Anytime Anywhere, No Download Limits, No Practice Limits
Get All 60 Questions & Answers