Limited-Time Offer: Enjoy 60% Savings! - Ends In 0d 00h 00m 00s Coupon code: 60OFF
Welcome to QA4Exam
Logo

- Trusted Worldwide Questions & Answers

Most Recent SAP C_S43_2022 Exam Questions & Answers


Prepare for the SAP Certified Associate - SAP S/4HANA Asset Management exam with our extensive collection of questions and answers. These practice Q&A are updated according to the latest syllabus, providing you with the tools needed to review and test your knowledge.

QA4Exam focus on the latest syllabus and exam objectives, our practice Q&A are designed to help you identify key topics and solidify your understanding. By focusing on the core curriculum, These Questions & Answers helps you cover all the essential topics, ensuring you're well-prepared for every section of the exam. Each question comes with a detailed explanation, offering valuable insights and helping you to learn from your mistakes. Whether you're looking to assess your progress or dive deeper into complex topics, our updated Q&A will provide the support you need to confidently approach the SAP C_S43_2022 exam and achieve success.

The questions for C_S43_2022 were last updated on Dec 17, 2024.
  • Viewing page 1 out of 16 pages.
  • Viewing questions 1-5 out of 80 questions
Get All 80 Questions & Answers
Question No. 1

Which objects can you assign to a Maintenance Service Order Item? Note: There are 2 correct answers to this question.

Show Answer Hide Answer
Correct Answer: A, B

Question No. 2

Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

Show Answer Hide Answer
Correct Answer: B

The Technical Object Breakdowns and Technical Object Damages app use SAP Lumira Designer to display data in a user-friendly and interactive way. SAP Lumira Designer is a tool that allows you to create analytical applications and dashboards based on SAP S/4HANA Core Data Services (CDS) views. SAP Asset Strategy and Performance Management and SAP Predictive Analysis are not components used to display data in this app, but they are other solutions that can help you optimize your asset management strategy and performance. References:

Technical Object Breakdowns

Technical Object Damages

[SAP Lumira Designer]


Question No. 3

Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question

Show Answer Hide Answer
Correct Answer: B, D

A notification item is used to describe a problem, damage, or the activity executed in greater detail. A notification item can be assigned to one or more object parts and one or more causes of damage. An object part is a component of a technical object that is affected by a malfunction or damage. A cause of damage is a factor that leads to a malfunction or damage. You can use catalogs to enter object parts and causes of damage in a coded form. Therefore, the correct answers are B and D.

References:

SAP Help Portal - Notification Item

SAP Help Portal - Object Part

SAP Help Portal - Cause of Damage

[SAP Learning - Creating Notifications]


Question No. 4

The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

Show Answer Hide Answer
Correct Answer: D

Question No. 5

You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question

Show Answer Hide Answer
Correct Answer: A, B

To set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents, you need to do the following steps:

Assign a piece of equipment with an allocated measuring point to a task list operation. This will allow you to inspect the equipment and record the measurement readings for the measuring point during the inspection round.You can assign the equipment either manually or automatically using the object list in the task list header1.

Assign a measuring point as a production resources/tools (PRT) to a task list operation. This will allow you to inspect the measuring point and record the measurement readings for it during the inspection round.You can assign the measuring point either manually or automatically using the PRT category 0010 (Measuring Point) in the task list operation1.

You do not need to assign an inspection lot to the task list header, as this is not required for inspection rounds.Inspection lots are used for quality inspections that are triggered by events such as goods receipt, production order, or sales order2.

You do not need to assign an inspection document as a PRT to the task list operation, as this is not supported for inspection rounds.Inspection documents are used for quality inspections that are based on inspection plans and inspection characteristics2.References:PM - General maintenance task listandSet up your SAP S/4HANA system for EAM Inspection Checklistsin SAP Help Portal.


Unlock All Questions for SAP C_S43_2022 Exam

Full Exam Access, Actual Exam Questions, Validated Answers, Anytime Anywhere, No Download Limits, No Practice Limits

Get All 80 Questions & Answers