Limited-Time Offer: Enjoy 50% Savings! - Ends In 0d 00h 00m 00s Coupon code: 50OFF
Welcome to QA4Exam
Logo

- Trusted Worldwide Questions & Answers

Most Recent SAP C_TS410_2022 Exam Dumps

 

Prepare for the SAP Certified Associate - Business Process Integration with SAP S/4HANA exam with our extensive collection of questions and answers. These practice Q&A are updated according to the latest syllabus, providing you with the tools needed to review and test your knowledge.

QA4Exam focus on the latest syllabus and exam objectives, our practice Q&A are designed to help you identify key topics and solidify your understanding. By focusing on the core curriculum, These Questions & Answers helps you cover all the essential topics, ensuring you're well-prepared for every section of the exam. Each question comes with a detailed explanation, offering valuable insights and helping you to learn from your mistakes. Whether you're looking to assess your progress or dive deeper into complex topics, our updated Q&A will provide the support you need to confidently approach the SAP C_TS410_2022 exam and achieve success.

The questions for C_TS410_2022 were last updated on Mar 27, 2025.
  • Viewing page 1 out of 16 pages.
  • Viewing questions 1-5 out of 80 questions
Get All 80 Questions & Answers
Question No. 1

Which master records are directly assigned to a company code? Note: There are 2 correct answers to this question

Show Answer Hide Answer
Correct Answer: C, D

In SAP, the master records that are directly assigned to a company code include Fixed Assets (D) and Activity Types (C). Fixed Assets are managed within the company code for asset accounting purposes, and Activity Types, used in Cost Center Accounting, can also be company code-specific, especially when used for internal cost allocations and calculations. Reference = SAP Financial Accounting (FI) and Controlling (CO) documentation and master data setup guides.


Question No. 2

You want the SAP S/4HANA system to perform product cost planning. What master data is used to calculate the quantity structure? Note. There are 2 correct answers to this question.

Show Answer Hide Answer
Correct Answer: A, D

Product Cost Planning in SAP: Product cost planning involves calculating the costs associated with manufacturing a product, which requires a detailed understanding of the quantity structure of the product.

Key Master Data Elements:

A . Routing: Defines the manufacturing or processing steps required to produce a product, including operations, sequences, work centers, and time elements, critical for calculating labor and machine costs.

D . Bill of Material (BOM): Lists all the components and materials required to manufacture a product, essential for calculating material costs.

Usage in Cost Calculation: Both routing and BOM are used in product cost planning to determine the quantity structure, which is the basis for calculating the cost of materials, labor, and overheads associated with producing a product.


SAP Product Costing Guide

SAP Help Portal on Cost Planning

Question No. 3

Which of the following are selection modes for running MRP? Note: There are 3 correct answers to this question

Show Answer Hide Answer
Correct Answer: A, C, D

Selection modes for running MRP in SAP include MRP Live (A), Classical MRP (C), and Regenerative MRP (D). These modes offer different approaches to material requirements planning, from real-time processing in MRP Live to comprehensive re-planning in Regenerative MRP. Reference = SAP Material Management (MM) and Production Planning (PP) documentation.


Question No. 4

What transactions credit a production order? Note: There are 2 correct answers to this question.

Show Answer Hide Answer
Correct Answer: A, D

In the context of a production order, Goods Receipt (A) and Order Settlement (D) are transactions that credit a production order. Goods Receipt credits the production order upon the receipt of the finished goods into inventory, reflecting the increase in stock. Order Settlement distributes the costs collected on the production order to the designated cost objects, such as cost centers or products, thereby crediting the order with the settled costs. Reference = SAP Production Planning (PP) and Controlling (CO) documentation.


Question No. 5

To what object can you settle an internal order?

Show Answer Hide Answer
Correct Answer: D

Internal orders can be settled to various objects for cost monitoring and analysis. Two common settlement receivers for internal orders are Profit Centers (C) and Fixed Assets (D). Settling to a Profit Center allows the allocation of costs for internal reporting and performance measurement, while settling to a Fixed Asset is used for capitalization of costs associated with the construction or acquisition of assets. Reference = SAP S/4HANA Financial Accounting (FI) and Controlling (CO) configuration guides and help documentation.


Unlock All Questions for SAP C_TS410_2022 Exam

Full Exam Access, Actual Exam Questions, Validated Answers, Anytime Anywhere, No Download Limits, No Practice Limits

Get All 80 Questions & Answers