Limited-Time Offer: Enjoy 60% Savings! - Ends In 0d 00h 00m 00s Coupon code: 60OFF
Welcome to QA4Exam
Logo

- Trusted Worldwide Questions & Answers

Most Recent US Green Building Council LEED-AP-O-M Exam Questions & Answers


Prepare for the US Green Building Council LEED AP Operations + Maintenance exam with our extensive collection of questions and answers. These practice Q&A are updated according to the latest syllabus, providing you with the tools needed to review and test your knowledge.

QA4Exam focus on the latest syllabus and exam objectives, our practice Q&A are designed to help you identify key topics and solidify your understanding. By focusing on the core curriculum, These Questions & Answers helps you cover all the essential topics, ensuring you're well-prepared for every section of the exam. Each question comes with a detailed explanation, offering valuable insights and helping you to learn from your mistakes. Whether you're looking to assess your progress or dive deeper into complex topics, our updated Q&A will provide the support you need to confidently approach the US Green Building Council LEED-AP-O-M exam and achieve success.

The questions for LEED-AP-O-M were last updated on Dec 17, 2024.
  • Viewing page 1 out of 34 pages.
  • Viewing questions 1-5 out of 168 questions
Get All 168 Questions & Answers
Question No. 1

A building is installing outdoor light fixtures that will directly emit light into the night sky. What is the minimum lamp lumens of the fixtures that must be partially or fully shielded to achieve a point for Sustainable Sites Credit, Light Pollution Reduction?

Show Answer Hide Answer
Correct Answer: C

For the Sustainable Sites Credit, Light Pollution Reduction, fixtures with a minimum of 1,500 lumens must be partially or fully shielded. This requirement helps to minimize light trespass and sky glow, contributing to the reduction of light pollution.


For the Sustainable Sites Credit, Light Pollution Reduction, outdoor light fixtures that directly emit light into the night sky and have a minimum lamp lumens exceeding 1,500 must be partially or fully shielded. This requirement is aimed at reducing light pollution by ensuring that outdoor lighting fixtures are designed and installed in a manner that minimizes sky glow and light trespass, thereby preserving the natural night environment.

Question No. 2

When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

Show Answer Hide Answer
Correct Answer: A

For the Materials and Resources Credit, Solid Waste Management - Ongoing, it is essential to accurately measure and document the amount of waste generated and diverted from landfills. This can be done by tracking the waste in terms of weight (pounds or kilograms) or volume (cubic yards or cubic meters). This method provides the most accurate accounting of waste management efforts and is a requirement for documenting performance for this credit. It allows for the calculation of diversion rates and effectiveness of waste reduction strategies.


The LEED for Building Operations and Maintenance Reference Guide details the requirements for waste tracking and documentation. This process is key to achieving the Solid Waste Management - Ongoing credit, which is aimed at reducing the amount of waste sent to landfills and incineration facilities, as emphasized in LEED AP O+M training materials.

Question No. 3

For projects not eligible for the ENERGY STAR rating, the project team could demonstrate compliance with Energy

and Atmosphere Prerequisite, Minimum Energy Efficiency Performance by

Show Answer Hide Answer
Correct Answer: D

Projects not eligible for the ENERGY STAR rating must demonstrate an energy efficiency of at least 25% better than the national average for typical buildings of similar type based on energy source. This can be done by using the ENERGY STAR Target Finder tool or a custom approved by USGBC.


For projects not eligible for the ENERGY STAR rating, an alternative path to demonstrate compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Efficiency Performance, is to show that the building's energy efficiency is significantly higher than the baseline established for similar buildings. Demonstrating energy efficiency that is at least 25% better than the national average for comparable buildings, based on the type of energy used, provides a quantifiable metric that reflects the building's superior performance. This approach aligns with LEED's goal to encourage higher energy efficiency standards and reduce environmental impact through improved building performance.

This alternative compliance path for projects not eligible for ENERGY STAR rating is outlined in the LEED for Building Operations and Maintenance reference guide under the Energy and Atmosphere category. It provides a method for buildings to achieve the Minimum Energy Efficiency Performance prerequisite by exceeding the energy performance standards of similar buildings, promoting an advanced level of energy conservation in building operations as emphasized in LEED AP O+M training materials.

Question No. 4

A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?

Show Answer Hide Answer
Correct Answer: A

Using on-site captured rainwater and municipally treated wastewater for both flush fixtures and irrigation can be applied towards the credits for both Indoor Water Use Reduction and Outdoor Water Use Reduction in LEED. These alternative water sources contribute to the overall water efficiency of the project by reducing the reliance on potable water sources for indoor and outdoor uses.


Question No. 5

Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water

budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use

Reduction project teams will be able to

Show Answer Hide Answer
Correct Answer: C

Evaluating the project's outdoor water budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use Reduction allows project teams to determine water use in landscape designs. This is because the outdoor water budget takes into account the water needs of the landscape, including plant types and climate conditions. By understanding this, teams can design landscapes that are water-efficient and meet the requirements for the Water Efficiency Credit.